RW022 afab

Advertisement
  • AFAB Accidently posted into period 12.

    Hi Expert, My user accidently planned posting run into period 12 (which somehow the close coordinator open period 12). And now user cannot do planned posting run for period 01. Can i reverse the planned posting run period 12? This is the error messag

    October 11

  • T code reqd for External No range which is reqd at the time of posting AFAB

    Hi Gurus, While i am running AFAB,the system shows that i have to give external no range for doc type.I have given no range in FBN1 but system denies.Can pl provide T code for external no range which is reqd for Depn run. Pl advise. Regards, SamarHi

    October 11

  • Error while Executing the Depreciation... in AFAB

    Hi experts We have not at run the depreciation for 2008. If i run the depreciation in AFAB by selecting the following parameters Company code = ABCD Fiscal year = 2008 Posting Period = 001 Planned posting run Test run i m getting the following error.

    October 11

  • Can't Run AFAB - Posting run requested for future period

    Hi, While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697 Diagnosis There was a check of your entries in the company code and posting

    October 11

  • Repeat run depreciation in AFAB

    Important and urgent The issue is related to depreciation, I have changed the depreciation key in the asset class and depreciation was posted this resulted in very high value of depreciation for the period. As standard SAP I understand that  when we

    October 11

  • ECC 6.0 :Error with AFAB ( Number Range Assginment)

    Dear All, Please advise We have upgrading from 4.7 to ECC 6.0 While running DEP AFAB, I get the following Error resulting Create document number range 03 using internal number assignment Message no. AA776 Diagnosis Processing terminated because the d

    October 11

  • After AFAB, I've changed depreciation key for an asset from 20% to 0%

    Hi All, I've posted depreciation (AFAB) for periods from 01 to 04 (Depreciation Area 20). Later I've changed the depreciation key for an asset from 20% to 0%. In my test SAP allows me to update depreciation data only in the period 05 (for previous da

    October 11

  • AFAB posting end of the year on period 13 instead of 12

    Hello, I've this request from accounting department. They would like to post depreciation for area 01  on special period 13 instead of 12 and with the following dates: DOCUMENT DATE:  15.04.xx+1   (following year) POSTING DATE: 31.12.xx This because

    October 11

  • Issue with AFAB (Depreciation Posting)

    We have recently gone live with AA. When I try to run depreciation AFAB, SAP gives me the error " You can only post in new year after closing the previous year. Message no. AA687 Diagnosis You want to post in a new fiscal year. However, a posting mus

    October 11

  • Problem in depreciation run -AFAB

    Hi, I hv uploaded asset balances as on 31.03.07 (FY2006) and closed the period . Subsequently, while trying to execute depreciation run in 2007 (period 1) system is giving error " year 2006 is not closed" while trying to run afab for period 12 i

    October 11

  • How to solve error when run Depreciation (T-Code:AFAB)

    Dear All Experts, Hi, I found error when run Depreciation for period 9 FYI. I had run Planed posting period Depreciation (TCode: AFAB).  with fiscal year: 2010, posting period: 9, reason for posting run: Planed posting run. Select on Test Run. Then i

    October 11

  • AFAB:Balancing field "Profit Center" in line item for Single Company

    Balancing field "Profit Center" in line item 005 not filled , This Error is coming for only one company code Alone in AFAB Tcode Thanks & Regards, DanielCheck this T.code OBC4.Here you need to check the field status group G001,G005.which Fie

    November 30

  • COPA Segment Not Updated during AFAB Run

    Hi Experts, While running AFAB run system is not recoganising the Product Category and Sales District which is maintained in " KEDR" . If we enter manually the entry in the system We will have to press one screen Derivation " Where it will

    November 30

  • Create additional postings in rapost2000 (trcn afab)

    Hi experts! I need to post additional accounting posting when we run the program RAPOST2000 (trcn AFAB). Additional accounting posting should be done (created) in dependencies of field ANLA-ORD43. If in field ANLA-ORD43 we have any datas we must post

    November 30

  • Depreciation calculation-AFAB

    Hello, Dep start date : 25.09.2008 Asset aquisition : 29-.09.2008 Dep rate : 10% While running AFAB, why system is calculating from 1 period i.e., Apr (Fiscal year is 2008) onwards. Dep should be calculated from 6 period i.e., Sep onwards. And how Ac

    November 30

  • Transaction error AFAB.

    Hello!! Please, can someone help me!! Can someone tell me How can I run the transaction AFAB without one asset. I have one error message in one asset. But the amount is cero, because the asset is completly depreciated. Message no. KI235 Account XXXX

    November 30

  • AFAB AF

    Hi!! When I run the transaction AFAB, there is a error message in one asset. But the amount is cero, beacuse the asset completly depreciated. Message no. KI235 Account 68170002 requires an assignment to a CO object In the depreciated planned: 10GREEN

    November 30

  • AFAB program performance different if TEST switch activated

    Hi colleagues, We are experiencing a strange performance in AFAB program. We have uploaded several assets in a particular company code. When executing AFAB transaction in TEST mode, the new assets are not considered, whereas, when performing a REAL e

    November 30

  • AFAB program strange performance in TEST mode

    Hi colleagues, We are experiencing a strange performance in AFAB program. We have uploaded several assets in a particular company code. When executing AFAB transaction in TEST mode, the new assets are not considered, whereas, when performing a REAL e

    November 30

  • After AFAB, there is no RABUCH session in SM35

    Dear Gurus, I am working with IDES R/3 4.71. after executing periodical run with AFAB, according to online document for IDES, there should be RABUCH session in SM35. but I found no session there. I checked Sm37, there is a job for RAPOST2000, and it

    November 30