Hi Team,
I am facing a potential problem with curriencies in ECM, we have 22 MOLGA in our Project. In this 20 Countries are assigned to 99 Country Grouping (this for ANSAL feature). We have created multiple Pay Scale structures and assigned respective currencies in MOLGA 99.
I am facing an issue with 99 Country grouping; I have an org unit with 3 Position belongs to 3 different company codes & Currencies (i.e., SA, AE and JP). While Manager is doing compensation planning for his team, in employee specific currency mode I am able to see defaulted currency as only one currency for all the employees.
Is it possible to have 20 countries for one MOLGA 99 or Do we need to maintain different country grouping for each currency. 
Your Inputs will be appreciated with valid points.
Regards
<b>SAM.C</b>
Consultant - SAP HR
Hi Chris,
I have resolved the issue. By the way I have created PS Groups and Levels in T710.
How ever we have tested whole scenario, with different curriences, we were able to resolve the issue
Regards
SAM.C
Related articles
  • Currency issue in ECM for MSS Planning 11-30

    Hi Team, I am facing a potential problem with curriencies in ECM, we have 22 MOLGA in our Project. In this 20 Countries are assigned to 99 Country Grouping (this for ANSAL feature). We have created multiple Pay Scale structures and assigned respectiv

  • Issue in PS Cash Management Planned payment coming from SD billing plan 10-11

    Issue in PS Cash Management: Coming from my sales order (SD billing plan), I get cash management lines item in PS ==> table COFP (Document Lines (project cash management)) with value type 62 (Planned Payments). Then I invoice the WBS element with VF0

  • S_ALR_87013558: Currency issue 10-11

    Hello All, we are facing below issue with the S_alr reports , for example S_ALR_87013558 # budget/ actuals/ commitment/ available etc.. Our controlling area currency is USD and project currency is EUR. My userid's RPC0/RPXn setting is to the Controll

  • Delivery 0080000276 is not relevant for transportation planning. 10-11

    At the time of (delivery related) invoice creation, system throws a message "check the error log". Log says: " Error Log             0080000276 000010 Delivery 0080000276 is not relevant for transportation planning             LongText     

  • Scope of Planning for Total Planning 10-11

    Hi SAP Gurus, My Client Scenario is as follows They import Spare Part materials from abroad to a Main Warehouse (defined as Plant in SAP) and then do stock transfer to around 60+ warehouse in different states (each defined as Plant in SAP). At any ti

  • Issue in creating Duet  Demand Planning Sheet on the basis of Dataview 10-11

    Hi all, We are using following landscape Landscape Details-  SAPAPO = SCM 700 0002 - SAPKY7002  Duet 1.5 - 150.700 SP3  Duet Demand Planning u2013 1000.150.700.3.0 (Server Component), 1000.150.700.3.0 (Client Component) There are 2 ways available

  • Hi when i run this in toad for explain plan  its showing an error ORA_22905 10-11

    hi when i run this query in toad for explain plan its showing an error ORA_22905 cannot accesss rows from an non nested table item can anyone help me out SELECT DISTINCT SERVICE_TBL.SERVICE_ID , SERVICE_TBL.CON_TYPE, SERVICE_TBL.S_DESC || '(' || SERV

  • Issue with authorizations for BPS 10-11

    Hi Experts, There was an issue with authorizations for BPS. We have a large number of agents that need to enter plan data via a layout. In order to control the necessary authorizations, we would like to filter via something similar to a user exit usi

  • Generating data source for a planning area 10-11

    Hi all, I have a problem when generating a datasource for a planning area as it gives the following logs. Activate table /1APO/EXT_STRUXXXXX Tabble 1APO/EXT_STRUXXXXX  was activated with warnings and the data source is not being activated. I have als

  • Verbose EXPLAIN PLAN output when asking for explain plan on simple SQL 11-30

    Hello. In a nutshell I have two issues: first, inability to execute EXPLAIN PLAN via SET AUTOTRACE ON EXPLAIN, and second, extremely verbose output when I log on as SYSDBA to circumvent the first issue. So, issue number one: I am trying to get an EXP

  • Cost and/or Conversion Rates are missing for some planning resources 11-30

    Hi, In Workplan of projects, we are facing a issue "Cost and/or Conversion Rates are missing for some planning resources". even though the schedules for the project WP is defined. Any inputs on this is highly apprciated. Thanks !!! Regards, Pall

  • Chnage log for Invoicing Plan 11-30

    HI Friends , Need your help on the below issue We are making a customised PO change report We want to capture the details which was done in Invoicing Plan in PO line item I tried chaging the Invoicing plan in PO line item but the change log does not

  • Organization View for Succesion Planning-My Org. Units! 11-30

    Hi, We are in process of implementing Nakisa (Release: 301_701) with EHP4 for few components including Succession Planning. We have completed Admin settings for Succession Planning. When we log in to End User section for succession planning & go to M

  • User issue with a report supply planning area today monthly 11-30

    this is a support issue....the user has an issue with a report supply planning area today monthly.  The user is getting wrong values in BW, it sums PLOs and POs under production (config).  for eg:  BW says we are producing 46T while in R/3 we have 4T

  • Shopping cart currency issue with Vendor order currency 11-30

    Hi, We are using SRM 7.0 with ECC 6.0 with classic scenario. There is a strange issue : Vendor order currency EUR. User currency USD in org plan.but while creating a PO from approved shopping cart in SRM sourcing cockpit it should take vendor currenc

  • False advertising for GSP Plan? 11-30

    Okay, I purchased an HTC One for Verizon back at the end of August from my closest Best Buy.  I got a great deal trading in my Galaxy S3 and paid pretty much for the case and screen protector only, couldnt pass that up.  I was told when I bought the

  • Basic Settings for Lifecycle planning 11-30

    Hello All, I want to maintain the basic settings of Life Cycle Planning to use Like Profile Transaction: /SAPAPO/MSDP_FCST1 - Lifecycle Planning My question is; is it a must to use 9AMATNR and 9ALOCNO characteristics in our POS? I have seen the sente

  • GRC PC 2.5 table for task plan and testlog and its link 11-30

    Hi, I want to know the list of tables used and the link between the tables related to GRC PC. Mainly I need tables involved while creating task plan, test logs. We need to develop a report using this data. We need to know how the tables are linked. W

  • How to find maximum number of users we can assign for Hyperion Planning. 10-11

    HI, How to find maximum number of users we can assign for Hyperion Planning.i.e., how to find license limit in hyperion planning 11.1.2.1. In Essbase propreties, the system is showing maximum planning users could be 65535. what would be the number fo

  • How to create a macro for a planning type in MC8b transaction 10-11

    Hi, I am presently working for a product allocation demand, which have a information structiure with characteristic and key field. the characteristic are production allocation quantity, incoming order quantity, and open order quantity. i have created